Switching moccasin suppliers
Switch moccasin slipper suppliers with control.
An existing sample shows the result, but it does not reveal every material, fit or construction decision. Mocario rebuilds the working specification before the partner factory develops a new physical reference.

01 — Control baseline
Rebuild control before production moves.
A sample alone is not enough for supplier transfer. Repeatability depends on the physical reference, size and fit context, frozen records and a newly approved sample.
Existing reference
Provide the best approved sample together with clear notes on what works, what does not and which details must remain.
Transfer specification
Collect the BOM, measurements, colours, construction, branding, packaging, tolerances and known risk points.
Fit context
Provide the size chart, target wearer and fit expectation, including width, instep, heel hold and use with bare feet or socks.
New physical approval
The new factory-made sample must be reviewed and approved; visual similarity to the old sample is not automatic acceptance.

02 -- Material and construction
Record what changes the finished moccasin slipper.
Every named component should connect to an approved reference or measurable requirement. Substitution requires review because even a visually similar input can alter fit, feel or durability.
BOM
Identify the upper, lining, footbed, foam, insole, outsole, thread, trims, labels and packaging components.
Materials
Define composition, thickness or weight, nap, hand feel, colour, finish and acceptable natural variation.
Last and sizing
Confirm the size chart, internal length, forefoot and instep volume, heel hold, footbed thickness, grading and target wearer profile.
Construction
Record seam method, apron stitching, reinforcement, assembly sequence and existing outsole attachment.
03 — Beyond the upper
The controlled product continues beyond the moccasin slipper.
Packaging, testing and compliance depend on destination market, intended use and the buyer's own programme. They should be defined before the commercial order is finalised.

Packaging
Protect and present the approved product.
Confirm box dimensions, tissue, inserts, labels, barcode data, assortment, packing method, carton marks and private-label artwork.

Testing
Verify the intended performance.
Select relevant tests for slip, flexing, adhesion, abrasion, colourfastness, accessory security, foam compression or water exposure.

Compliance
Set the destination-market basis.
Confirm applicable labelling, chemical, children's-product, sustainability and buyer-restricted-substance requirements. No standard is assumed without project confirmation.
Review testing and compliance →Cost responsibility: buyer-requested testing, third-party inspection and additional audit work are confirmed separately. Responsibility for corrective work or retesting is determined from the verified cause and agreed order terms.
04 — Quality language
Use shared definitions before inspection.
The approved sample, specification, PO requirements, defect definitions and agreed inspection plan form the release baseline. AQL, sample size and acceptance criteria remain project-specific.

Critical
A condition that may create a serious safety, legal or intended-use concern.
Hold release and escalate for a documented decision.
Major
A condition affecting fit, function, durability, appearance or saleability.
Count, document and agree correction or disposition.
Minor
A limited deviation that does not materially affect intended use or saleability.
Record it against the approved tolerance and inspection plan.
05 — Risk register
Put known issues into the plan.
Recurring risks should become specification points, sample checks or inspection criteria—not surprises discovered shortly before shipment.
06 — Production readiness
PPS connects approval to bulk production.
After the correct PO, confirmed PI and required initial payment, the partner factory prepares a PPS using the intended bulk materials. Mocario reviews the physical PPS and supporting evidence before requesting the buyer's written approval.
-
01
Check the order
Resolve differences between the quotation, PO, PI and approved product record.
-
02
Build the PPS
Use the order's intended bulk materials and final production documents.
-
03
Review evidence
Mocario checks the physical sample before submitting evidence to the buyer.
-
04
Approve in writing
Written PPS approval releases bulk purchasing and production.
07 — Continue the study
Use the right resource at each stage.
Mocario remains the buyer's commercial and project contact while the partner factory executes physical sampling and production.
08 — Start a project
Define clearly. Approve deliberately.
Share your reference, intended market, quantity and timing. Mocario will identify the specification, approval and production-control decisions required for the project.