Moccasin slipper production management, from PPS to shipment.

Mocario coordinates the commercial and production sequence between the customer and the selected partner factory, keeping approvals, order data, progress, inspection findings and release decisions connected.

01
Freeze
02
Approve
03
Track
04
Release
Moccasin production coordination
Approved PPS → controlled handover PM / 01

01 — Control basis

Production follows approved references, not assumptions.

The production record combines the approved physical PPS with the current order and technical information. A later change must be identified, assessed and reconfirmed before it enters production.

01

Approved PPS

The physical reference for final materials, construction, fit, appearance, branding and packaging.

02

Frozen specifications

BOM, measurements, colors, labels, artwork versions, packaging and testing requirements.

03

Confirmed order

PO and PI terms, quantities, size and color breakdowns, price, payment and delivery conditions.

04

Release requirements

Inspection, testing, customer decisions, payment, booking and export-handover conditions.

02 — Order confirmation

Freeze the order record before production commitment.

Before an order is accepted, Mocario checks that the commercial record and approved product direction describe the same deliverable.

Moccasin order review
01

Product record

Style, material, color, size, construction, footbed, outsole and intended usage.

02

Brand and packing

Approved artwork versions, label placement, pair packing, boxes, barcodes and carton marks.

03

Commercial record

Quantity, size and color assortment, price, payment, target timing and FOB Ningbo terms.

04

Market obligations

Applicable testing, labeling, inspection, document and destination-market requirements.

05

Change status

Any open revision, pending approval or inconsistency that must be closed before the next commitment.

Moccasin PPS approval

03 — PPS approval gate

Approve the production standard before bulk execution.

After the PO, signed-back PI and deposit are confirmed, the partner factory prepares a pre-production sample using the intended bulk materials and final construction.

Required decision

Mocario checks the physical PPS first. The customer then provides written approval before bulk material purchasing and production begin.

  • 01Confirm bulk materials, color and visible finish.
  • 02Confirm final fit, measurements and construction.
  • 03Confirm branding, packaging and production documents.
  • 04Record any approved deviation from the earlier sample.

04 — Production visibility

Track milestones that can affect delivery.

The partner factory provides a production progress table to Mocario every two weeks. Exceptions are escalated when they can affect the approved product, schedule or shipment conditions.

P·01

Material readiness

Availability, arrival, batch status and exceptions affecting approved materials or components.

P·02

Production stage

Cutting, stitching, assembly, finishing, packing and the status of the scheduled quantity.

P·03

Timing variance

Observed delay, dependency or capacity issue compared with the confirmed working schedule.

P·04

Required action

Corrective action, decision owner and next confirmation needed to protect the order.

Moccasin production progress
Production issue review

05 — Exception handling

Document the condition before choosing the response.

The response depends on product impact, affected quantity, repairability and schedule effect. Mocario coordinates facts and practical options; material commercial decisions remain subject to written customer direction.

01

Assess

Confirm the issue, location, quantity, observed proportion and potential order impact.

02

Correct

Allow repairable issues to be corrected by the factory and rechecked where practical.

03

Escalate

Report non-repairable or significant issues with affected quantity or proportion, risk and solution options for the customer's written decision.

04

Decide

Record the customer's written commercial direction before affected goods are released.

06 — Inspection and release

Complete the agreed controls before shipment.

There is no universal release promise outside the conditions confirmed for the specific order.

  • 01Mocario's random pre-shipment inspection has been completed and reviewed.
  • 02Applicable testing, or customer-requested third-party inspection at the customer's cost, has been completed.
  • 03Any material release issue has a documented customer decision.
  • 04Required payment, booking and export-declaration conditions are ready.
  • 05Commercial invoice, packing list and applicable transport documents are prepared.
Moccasin shipment release
Export declaration and loadingFOB Ningbo

FOB boundary

Mocario coordinates export declaration and responsibility through loading at Ningbo. The customer or nominated forwarder arranges booking, international freight, insurance where required and destination import handling.

07 — Related controls

Follow the order into quality and delivery.

Review the control standards, inspection route, FOB handover and practical production notes connected with this process.

08 — Plan the order

Approved references.
Visible production decisions.

Share your approved product direction, expected quantity, market, timing and order requirements. Mocario will review the production route before commitment.

Contact Mocario