Moccasin production management
Moccasin slipper production management, from PPS to shipment.
Mocario coordinates the commercial and production sequence between the customer and the selected partner factory, keeping approvals, order data, progress, inspection findings and release decisions connected.
- 01
- Freeze
- 02
- Approve
- 03
- Track
- 04
- Release

01 — Control basis
Production follows approved references, not assumptions.
The production record combines the approved physical PPS with the current order and technical information. A later change must be identified, assessed and reconfirmed before it enters production.
Approved PPS
The physical reference for final materials, construction, fit, appearance, branding and packaging.
Frozen specifications
BOM, measurements, colors, labels, artwork versions, packaging and testing requirements.
Confirmed order
PO and PI terms, quantities, size and color breakdowns, price, payment and delivery conditions.
Release requirements
Inspection, testing, customer decisions, payment, booking and export-handover conditions.
02 — Order confirmation
Freeze the order record before production commitment.
Before an order is accepted, Mocario checks that the commercial record and approved product direction describe the same deliverable.

Product record
Style, material, color, size, construction, footbed, outsole and intended usage.
Brand and packing
Approved artwork versions, label placement, pair packing, boxes, barcodes and carton marks.
Commercial record
Quantity, size and color assortment, price, payment, target timing and FOB Ningbo terms.
Market obligations
Applicable testing, labeling, inspection, document and destination-market requirements.
Change status
Any open revision, pending approval or inconsistency that must be closed before the next commitment.

03 — PPS approval gate
Approve the production standard before bulk execution.
After the PO, signed-back PI and deposit are confirmed, the partner factory prepares a pre-production sample using the intended bulk materials and final construction.
Required decision
Mocario checks the physical PPS first. The customer then provides written approval before bulk material purchasing and production begin.
- 01Confirm bulk materials, color and visible finish.
- 02Confirm final fit, measurements and construction.
- 03Confirm branding, packaging and production documents.
- 04Record any approved deviation from the earlier sample.
04 — Production visibility
Track milestones that can affect delivery.
The partner factory provides a production progress table to Mocario every two weeks. Exceptions are escalated when they can affect the approved product, schedule or shipment conditions.
Material readiness
Availability, arrival, batch status and exceptions affecting approved materials or components.
Production stage
Cutting, stitching, assembly, finishing, packing and the status of the scheduled quantity.
Timing variance
Observed delay, dependency or capacity issue compared with the confirmed working schedule.
Required action
Corrective action, decision owner and next confirmation needed to protect the order.


05 — Exception handling
Document the condition before choosing the response.
The response depends on product impact, affected quantity, repairability and schedule effect. Mocario coordinates facts and practical options; material commercial decisions remain subject to written customer direction.
Assess
Confirm the issue, location, quantity, observed proportion and potential order impact.
Correct
Allow repairable issues to be corrected by the factory and rechecked where practical.
Escalate
Report non-repairable or significant issues with affected quantity or proportion, risk and solution options for the customer's written decision.
Decide
Record the customer's written commercial direction before affected goods are released.
06 — Inspection and release
Complete the agreed controls before shipment.
There is no universal release promise outside the conditions confirmed for the specific order.
- 01Mocario's random pre-shipment inspection has been completed and reviewed.
- 02Applicable testing, or customer-requested third-party inspection at the customer's cost, has been completed.
- 03Any material release issue has a documented customer decision.
- 04Required payment, booking and export-declaration conditions are ready.
- 05Commercial invoice, packing list and applicable transport documents are prepared.

FOB boundary
Mocario coordinates export declaration and responsibility through loading at Ningbo. The customer or nominated forwarder arranges booking, international freight, insurance where required and destination import handling.
07 — Related controls
Follow the order into quality and delivery.
Review the control standards, inspection route, FOB handover and practical production notes connected with this process.
08 — Plan the order
Approved references.
Visible production decisions.
Share your approved product direction, expected quantity, market, timing and order requirements. Mocario will review the production route before commitment.
Contact Mocario