01
Reference
02
Process
03
Verification
04
Decision
Moccasin quality control
Approved PPS → shipment release QC / 01

01 — Control basis

Use one agreed baseline for every decision.

Quality cannot be evaluated against an expectation introduced after production. The applicable product, order and inspection references must be confirmed before the production commitment.

Approved moccasin references
01

Approved PPS

The physical reference for final materials, construction, fit, appearance, branding and packaging.

02

Frozen information

Current BOM, measurements, colors, artwork, labels, packing method and applicable tolerances.

03

Purchase order

Style, quantity, size and color assortment, packaging, testing, inspection and delivery conditions.

04

Defect criteria

Agreed defect classification, measurement tolerances and workmanship expectations for the order.

05

Sampling method

Customer-specified defect classification and AQL take priority. If none are provided, Mocario applies the default AQL: Critical 0, Major 2.5 and Minor 4.0.

02 — Layered responsibility

Separate process control from independent verification.

Different checks serve different purposes. Factory process control does not replace Mocario's random inspection, and neither replaces project-specific laboratory testing or a customer-appointed inspection.

Partner factory

Control the production process

Manage incoming materials, cutting, stitching, assembly, finishing, packing and corrective work within the factory's production system.

Mocario

Coordinate and verify

Check the physical PPS, coordinate order records and progress, perform a random pre-shipment inspection and report release-relevant findings.

Customer or appointed party

Define special requirements

Confirm mandatory tests, inspection standards, third-party scope, destination requirements and written commercial decisions. Customer-requested third-party inspection is coordinated by Mocario and paid for by the customer.

Control limitation

Quality control reduces risk and creates evidence; it does not mean every unit is individually inspected or that all possible defects can be eliminated.

03 — Process checkpoints

Check the details while correction is still practical.

The factory's internal checks should follow the approved references through material preparation and assembly. Mocario uses progress information and physical checkpoints to identify deviations requiring clarification.

P·01

Material readiness

Batch color, grain or nap, thickness, lining, components and approved alternatives.

P·02

Upper construction

Pattern alignment, apron shape, stitch spacing, thread tension and component positioning.

P·03

Assembly and fit

Lasting shape, internal dimensions, left-right match, footbed and outsole alignment.

P·04

Finish and packing

Surface condition, labels, pair presentation, inserts, boxes, assortment and carton marks.

Moccasin process inspection
Moccasin performance testing

04 — Testing and compliance

Define performance questions before production release.

Testing scope depends on the product, intended use, destination market and customer requirements. A request for testing is not presented as a passed test result.

Slip resistance
Flexing and bonding
Abrasion and color fastness
Accessory security
Foam compression
Packaging performance
Review testing guidance

05 — Pre-shipment verification

Review the finished order before release.

Mocario performs a random inspection at the partner factory and compares selected finished goods with the applicable approved product and order references.

01

Product consistency

Shape, left-right match, stitching, heel form, material, color and workmanship.

02

Measurements

Applicable dimensions, size identification and defined construction control points.

03

Order quantity

Cartons, assortments, sizes, colors and quantity information available for checking.

04

Packing condition

Labels, pair packing, boxes, inserts, carton marks and presentation requirements.

Moccasin final inspection

06 — Defect escalation

Match the response to the product and shipment impact.

Findings are assessed by type, observed frequency, repairability and commercial effect. Release-relevant issues are documented before a decision is requested.

01

Repairable and contained

The factory corrects a limited issue that can be repaired without changing the approved product or agreed release conditions, followed by rechecking.

02

Repeated or material

A repeated workmanship problem, unapproved substitution or measurable deviation requires cause review and corrective action.

03

Release-blocking

A non-repairable, high-rate or sales-relevant issue is reported with its quantity, impact and options before the customer confirms a written direction.

07 — Related controls

Connect prevention, verification and response.

Use the related pages to define testing, understand final inspection, prepare claim evidence and read practical quality notes.

08 — Define the standard

Clear references.
Responsible release.

Share the product direction, intended market, expected quantity, quality requirements and timing. Mocario will review the appropriate control route before development or production commitment.

Contact Mocario
Reference · Process · Verificationchris@mocario.comOrder-specific control